Aspects influencing man-hour efficiency of kit preparation for mixed-model assembly
Paper i proceeding, 2016

Materials supply through kitting can enable space-efficient parts presentation that supports flexibility, quality and efficiency at the assembly stations. However, the preparation of kits is generally associated with considerable man-hour consumption and cost. Within industry, no consensus exists regarding how kit preparation should be designed with respect to man-hour consumption, and literature on the topic is scarce. Based on a literature review and utilizing the experience of an expert panel from industry, the paper uses a cross-case analysis of 15 cases from the automotive industry to identify critical design aspects of kit preparation systems and how they affect man-hour consumption.

Kitting

mixed-model assembly

kit preparation

Författare

Robin Hanson

Chalmers, Teknikens ekonomi och organisation, Supply and Operations Management

Lars Medbo

Chalmers, Teknikens ekonomi och organisation, Supply and Operations Management

Proceedings of SPIE - The International Society for Optical Engineering

0277786X (ISSN) 1996756X (eISSN)

Vol. 44 353-358

Ämneskategorier (SSIF 2011)

Produktionsteknik, arbetsvetenskap och ergonomi

Drivkrafter

Hållbar utveckling

Styrkeområden

Transport

Produktion

DOI

10.1016/j.procir.2016.02.064

Mer information

Skapat

2017-10-07