Aspects influencing man-hour efficiency of kit preparation for mixed-model assembly
Paper in proceeding, 2016

Materials supply through kitting can enable space-efficient parts presentation that supports flexibility, quality and efficiency at the assembly stations. However, the preparation of kits is generally associated with considerable man-hour consumption and cost. Within industry, no consensus exists regarding how kit preparation should be designed with respect to man-hour consumption, and literature on the topic is scarce. Based on a literature review and utilizing the experience of an expert panel from industry, the paper uses a cross-case analysis of 15 cases from the automotive industry to identify critical design aspects of kit preparation systems and how they affect man-hour consumption.

Kitting

mixed-model assembly

kit preparation

Author

Robin Hanson

Chalmers, Technology Management and Economics, Supply and Operations Management

Lars Medbo

Chalmers, Technology Management and Economics, Supply and Operations Management

Proceedings of SPIE - The International Society for Optical Engineering

0277786X (ISSN) 1996756X (eISSN)

Vol. 44 353-358

Subject Categories (SSIF 2011)

Production Engineering, Human Work Science and Ergonomics

Driving Forces

Sustainable development

Areas of Advance

Transport

Production

DOI

10.1016/j.procir.2016.02.064

More information

Created

10/7/2017